RFQ – Appliance Installation

    * All fields are required

    1. Property Name

    2. Property Address

    3. Point of Contact On-Site (Name & Phone No.)

    4. Point of Contact Email

    5. What is the preferred date for installation? If multiple phases are needed, please provide a breakdown of the phases, room count, and installation dates per phase.

    6. Is this a New or Existing Property? (Check all that apply)
    NewExistingThe building will be occupied at the time of installation.
    7. How many buildings require installation?

    8. How many floors per building?

    9. How many rooms will need installation?

    10. The property will provide access to the following: (Check all that apply)
    A service elevatorA dumpster to dispose of trashA staging/storage area with the capacity to hold all the new product being deliveredLodging accommodations for the installation crew (two double rooms is standard)
    11. What appliances will be installed: (Check all that apply)
    Full-Size RefrigeratorIce MakerRangeHoodDishwasherOver-the-Range MicrowaveCounter top MicrowaveWasherDryerCompact RefrigeratorRemoval/Liquidation of existing will be needed
    12. What accessories will be needed: (Check all that apply)
    Fridge waterlineDishwasher power cord and hose kitDishwasher mountRange 3-prong power cordRange 4-prong power cordIce Maker waterlineMicrowave trim kitWasher water hosesDryer power cordDryer duct

    Michael CastnerRFQ – Appliance Installation