Site acceptance testing, or SAT, verifies that installed equipment or systems meet agreed requirements within the actual hotel environment. Unlike factory testing, site testing accounts for the property's infrastructure, connections, configuration, integrations, and operating conditions. For example, a casting platform may function correctly in a controlled testing environment but encounter connectivity or configuration problems when connected to the hotel's production network.
Site acceptance testing helps confirm that the installed solution works in the environment where guests and employees will use it.
Installation places equipment into service, while commissioning verifies that the completed system performs as intended.
Commissioning should be planned during hotel project design so performance requirements can guide procurement and installation.